Currency KZT
Repair of gas turbines for gas-turbine units order in Ereimentau
Order Repair of gas turbines for gas-turbine units
Repair of gas turbines for gas-turbine units

Repair of gas turbines for gas-turbine units

Reconfirm the price with seller
Seller
Kazakhstan, Ereimentau
(View map)
Description

Repair of gas turbines for gas-turbine units

Minimum duration of operation: 12 hours after each start, except for commissioning, servicing and work on emergency supply. This term is not obligatory, but the frequency of work on THAT specified in instructions is based on it. Non-compliance with the minimum service life of details is not reflected in guarantee certificates, however considerably influences service life of various knots.

Idling of the gas-piston engine of power plant: restriction of time is carried out through control systems of the unit (idling has to be shorter, except for works on servicing and control).

Work with partial loading of the gas-piston engine of power plant: Work with partial loadings without restrictions - but not less than 40% of a rated load. Observance of level of issues is guaranteed only at loadings higher than 50%.

Long operation of the gas-piston engine of power plant: Operation of the engine with a rated load is most desirable.

Contact the seller
Repair of gas turbines for gas-turbine units
Repair of gas turbines for gas-turbine units
Compare0